The list below is of the stations covered on the Chennai Metro Green Line. They will be fully operational in the coming years. *Note: The stations from Pallavaram to Kilambakkam are under construction. Inter Corridor Line, Bus Terminus, Purple Line Inter Corridor Line, Chennai Suburban Railways, Chennai International Airport Inter Corridor Line, Green Line, Red Line Inter Corridor Line, Chennai Suburban Railways Green Line, Inter Corridor Line, Chennai Central Railway Station, Chennai Park Suburban, Chennai Moore Market Suburban, Chennai Park Town MRTS The list below is of the stations covered on the Chennai Metro Blue Line. Madhavaram Milk Colony – Siruseri Sipcot 2 The table below summarises the Chennai Metro lines.Ĭhennai Central – Chennai International Airport Wimco Nagar Depot– Chennai International AirportĬhennai Central Railway Station – St Thomas Mount These upcoming lines will be partly elevated and partly underground. The Purple Line, Red Line, and Orange Line are under construction. the Blue Line and Green Line are operational. Chennai Metro Timings: 5:00 am to 11:00 pm (Mon–Sat) 7:59 am to 10:03 pm (Sun)Ĭurrently, only two Chennai Metro lines, i.e.Number of Lines: 2 (operational) 4 (under construction).Owner: Chennai Metro Rail Limited (jointly formed by Government of Tamil Nadu and Government of India).Every day, around 2 lakh (200,000) people travel on the 52 trains on the system, each of which has four coaches, across a route length of 54.6 km Chennai Metro Quick Info Chennai Metro uses 1,435 mm (standard gauge) tracks and overhead catenary carrying an alternating current of 25 kilovolts. The system has no at-grade tracks, and trains either run on elevated viaducts or underground. Currently, Phase 1 is operational and under extension, while Phase 2 is under planning and tendering. Chennai Metro serves the mass transit needs of the city of Chennai.
0 Comments
Leave a Reply. |